During installation inspect the groove area and remove any debris that may prevent proper assembly of planks.
Tarkett flooring installation instructions.
Check the rules in your country.
Ensure the subfloor is dry clean and flat.
Do not use a hammer and tapping block to install planks.
Room temperature must be maintained between 65 ー workmanship is employed in the and 85 ーf 18 ー and 30 ーc with hvac system operating.
Do not install damaged planks.
These instructions combined with our adhesives and flooring products create a system.
Rubber tile flooring installation instructions introduction these instructions are written as a guide to be used by professional installers when installing tarkett products.
Rolls and tiles must be stored during 48 hours before starting the operation.
Place 1 4 6 3mm spacers between the short and long side of the planks and the wall use 1 2 12 7mm spacers for.
Do not fasten them through the laminate flooring.
If this measurement is less than 12 20 3cm the length of first plank in the row must be cut.
For installation room temperature should always be above 15 c or 18 c for linoleum.
Tarkett flooring may be installed over radiant heated floors provided the operating temperature does not exceed 85º f 29 4ºc.
Those temperatures could be different.
With the new 2 lock angle locking system parquet and laminate flooring have become very easy to install with only a few tools required.
In most cases you need to remove the existing floor covering.
The end joints of the planks in the first row.
Tarkett flooring and adhesives must be site conditioned at room temperature for a minimum of 48 hours prior to during and after installation.
Before installation sheets and tiles should relax minimum 24h out of packaging.
However there are a few exceptions.
Tarkett laminate8 installation instructions 2 locktarkett laminate9 installation instructions 2 lock finish remove the spacers from the perimeter of the room.
Measure distance between wall and surface of full plank.
If the heating pipes are too close to the flooring the flooring may discolor next to the pipe work.
Tarkett will not accept responsibility for claims on flooring installed with obvious defects.
Installation begin laying planks from the left side of the starting wall and work to the right side.
Released may 2013 page 1 of 2 expressions vct inst 050713.
To get started you need to do the following.
Install transition reduction profiles where needed.
Subtract 1 4 6 3mm or 1 2 12 7mm depending on the size of the spacer used from this measurement to allow for the spacer.
Saw pencil tape measure vacuum cleaner step 1 prepare your subfloor to ensure a smooth installation it is important to prepare the surface.
Pvc or.
Heating pipes shall be at least 2 inches 50 8mm below the surface of the concrete.